Location: Carrara (Italia)
Client: Progetto Carrara
Year: 2000 – 2008
Santa Croce tunnel is 1018m long and was built along the Strada dei Marmi road funded by Progetto Carrara in 2000. SGS dealt with executive design of the tunnel and portals.
Location: Carrara (Italia)
Client: Progetto Carrara
Year: 2000 – 2008
Santa Croce tunnel is 1018m long and was built along the Strada dei Marmi road funded by Progetto Carrara in 2000. SGS dealt with executive design of the tunnel and portals.