Location: Bucharest (Romania)
Client: ASTALDI S.p.A.
Year: 2015-2016
This project included the construction of the M4 metro line extension between Straulesti station and Zarea shaft through TBM excavation.
SGS was involved in the geotechnical and structural design of the tunnels and ancillary works as well of the additional works related with existing assets.